M‑Prime 104 & MaxLine 100 – Potable Water Tank Guide

Application Guide — Concrete Potable Water Tanks

Interactive, on‑site steps for M‑Prime 104 (primer) and MaxLine 100 (lining/topcoat). Use the calculator and checklist to plan materials and verify quality.

Potable water safe (edit with your certification) Concrete substrates Elementor‑ready

M‑Prime 104 — Procedures

Est. crew time: 1–2 days

QA/QC — Acceptance Criteria

Use in pre‑start meetings and during ITP/hold points. Edit the criteria to match your specifications.

1) Concrete substrate condition
  • Minimum compressive strength: ≥ 25 MPa (edit)
  • Moisture content: < 5% (CM method) (edit)
  • Surface profile: CSP 3–5 (ICRI) (edit)
2) Environmental conditions
  • Air/Substrate temp during application: 10–30 °C (edit)
  • Rel. humidity: < 80% (edit)
  • Dew point: substrate at least 3 °C above dew point (edit)
3) DFT & Holiday testing
  • DFT target (MaxLine 100): — μm (enter spec)
  • Holiday test: High‑voltage spark test per NACE SP0188 (edit)